Instructions for adding Inhibitor to a Boilermate III ?

View previous topic View next topic Go down

Instructions for adding Inhibitor to a Boilermate III ?

Post  HotMart on Mon Aug 24, 2015 2:56 am

Hello,

Sorry if this has been asked before but I carried out a search and could not find a guide for this process.

Looking for instructions on the correct way to add inhibitor to the bm iii system after draining it down at the weekend to replace the three port valve.

Draining was carried out via the hallway radiator.

There are 8 x radiators in total.

Is it just as simple as adding the required does into the top of the Feed and expansion system ?

Thanks in advance.

HotMart

Posts : 12
Join date : 2012-11-27

View user profile

Back to top Go down

Re: Instructions for adding Inhibitor to a Boilermate III ?

Post  mike on Fri Aug 28, 2015 6:43 pm

8 rads = 1 bottle (10 rads really)
The unit will need a bottle per 100 litres.
Drain water out, add protector into top tank.And re fill system
Mike

mike

Posts : 1646
Join date : 2009-10-08
Age : 64
Location : Norwich

View user profile http://www.mgch20.co.uk

Back to top Go down

View previous topic View next topic Back to top

- Similar topics

 
Permissions in this forum:
You cannot reply to topics in this forum