Instructions for adding Inhibitor to a Boilermate III ?

Go down

Instructions for adding Inhibitor to a Boilermate III ? Empty Instructions for adding Inhibitor to a Boilermate III ?

Post  HotMart on Mon Aug 24, 2015 2:56 am

Hello,

Sorry if this has been asked before but I carried out a search and could not find a guide for this process.

Looking for instructions on the correct way to add inhibitor to the bm iii system after draining it down at the weekend to replace the three port valve.

Draining was carried out via the hallway radiator.

There are 8 x radiators in total.

Is it just as simple as adding the required does into the top of the Feed and expansion system ?

Thanks in advance.

HotMart

Posts : 12
Join date : 2012-11-27

Back to top Go down

Instructions for adding Inhibitor to a Boilermate III ? Empty Re: Instructions for adding Inhibitor to a Boilermate III ?

Post  mike on Fri Aug 28, 2015 6:43 pm

8 rads = 1 bottle (10 rads really)
The unit will need a bottle per 100 litres.
Drain water out, add protector into top tank.And re fill system
Mike

mike

Posts : 1747
Join date : 2009-10-08
Age : 66
Location : Norwich

http://www.mgch20.co.uk

Back to top Go down

Back to top


 
Permissions in this forum:
You cannot reply to topics in this forum