Hello,
Sorry if this has been asked before but I carried out a search and could not find a guide for this process.
Looking for instructions on the correct way to add inhibitor to the bm iii system after draining it down at the weekend to replace the three port valve.
Draining was carried out via the hallway radiator.
There are 8 x radiators in total.
Is it just as simple as adding the required does into the top of the Feed and expansion system ?
Thanks in advance.
Sorry if this has been asked before but I carried out a search and could not find a guide for this process.
Looking for instructions on the correct way to add inhibitor to the bm iii system after draining it down at the weekend to replace the three port valve.
Draining was carried out via the hallway radiator.
There are 8 x radiators in total.
Is it just as simple as adding the required does into the top of the Feed and expansion system ?
Thanks in advance.
HotMart- Posts : 12
Join date : 2012-11-27
Re: Instructions for adding Inhibitor to a Boilermate III ?
8 rads = 1 bottle (10 rads really)
The unit will need a bottle per 100 litres.
Drain water out, add protector into top tank.And re fill system
Mike
The unit will need a bottle per 100 litres.
Drain water out, add protector into top tank.And re fill system
Mike
Similar topics
» Inhibitor for Boilermate 2000
» Adding pressure
» Adding TRVs
» Inhibitor ammounts
» Pulsacoil Eco stainless - Scale inhibitor
» Adding pressure
» Adding TRVs
» Inhibitor ammounts
» Pulsacoil Eco stainless - Scale inhibitor
Page 1 of 1
Permissions in this forum:
You cannot reply to topics in this forum