Two bottles in 12 months

Go down

Two bottles in 12 months

Post  B@man on Sat Dec 15, 2012 3:38 am

Just had plumber around to replace leaking PRV, three weeks ago he fitted a new bottle, he commented that the bottle seema very noisy and we would expect them to last over 8 months.

Is it possible that the pump used in the bottle circuit is less efficient and is not circulating water fast enough causing the heater to fail prematurely. Two of the pumps are 10 years old only the DHW pump has been replaced.

B@man

Posts : 11
Join date : 2012-04-16

View user profile

Back to top Go down

Re: Two bottles in 12 months

Post  mike on Mon Dec 17, 2012 2:41 pm

Bottle?????
Explain better please
Mike

mike

Posts : 1718
Join date : 2009-10-08
Age : 65
Location : Norwich

View user profile http://www.mgch20.co.uk

Back to top Go down

Re: Two bottles in 12 months

Post  B@man on Mon Dec 17, 2012 4:05 pm

Hi Mike, by bottle I mean the heater assembly.
Sorry plumber called it a bottle due to it's shape.

B@man

Posts : 11
Join date : 2012-04-16

View user profile

Back to top Go down

Re: Two bottles in 12 months

Post  life of bryan on Fri May 17, 2013 2:08 pm


life of bryan

Posts : 22
Join date : 2013-04-01

View user profile

Back to top Go down

Re: Two bottles in 12 months

Post  Sponsored content


Sponsored content


Back to top Go down

Back to top


 
Permissions in this forum:
You cannot reply to topics in this forum